Clean concrete & inert
Broken slab, kerb, block, brick, clean subbase.
£9.50per tonne, clean
Specification 10.0% off-stream by weight
Book this stream
What takes this can off the clean rate
- Any plasterboard at all — sulphate contaminates the crusher feed.
- Reinforcement longer than 300 mm still cast into the lump.
- Painted or rendered faces on more than a tenth of the load.
- Soil in the bottom of the can from the last job.
At the gate
- Outlet
- Crushed on site to 6F2 subbase and sold back out of the yard.
- Density
- 1.35 t per cubic yard
- Rate
- £9.50 per tonne
- Weighbridge
- 0117 496 0318
One clean concrete can, loaded badly
As specified £9.50
In the can £9.50£9.50£9.50£9.50£9.50£186.00£186.00£186.00
Mixed C&D £186.00
Specification is 10.0% off-stream by weight. Cross it and the whole can is re-graded — not the offending part of it, the can.
- Broken slab and kerb, nothing else 0.0% off spec ΔE 0.00
- Half a pallet of blockwork off the same lift 0.0% off spec ΔE 0.00
- The subsoil that came up under the slab 3.8% off spec ΔE 1.10
- Fence posts and the shuttering ply 6.7% off spec ΔE 1.45
- The hedge that was in the way 8.9% off spec ΔE 1.93
- One skip bag of packaging off the delivery 10.2% off spec ΔE 2.17 re-graded — the whole can goes on the mixed rate
- A mattress out of the back bedroom 10.7% off spec ΔE 2.31
- And the rest of the strip-out, because the rate had already gone 31.9% off spec ΔE 7.16
The same photograph, ungraded
scripts/plates.mjs requires it to fail.